At the Defense Supply Center Richmond, roof leaks caused extensive microbial growth on interior fiberglass roof insulation panels. Scaffolding was installed to within 7 feet of the roof deck and AIM removed approx. 400,000 SF of affected fiberglass panels in a HEPA filtered negative pressure containments in 10 different bays. The project lasted 14 months. Mold resistant gypsum panels were installed.

Project details

  • October 20, 2014Date: